CASE STUDIES

A care home in Carmarthen protected by Sprinkler Protection UK, this is their first FLOWST8n and our first 400volt unit installed. A Temporary power supply tripped the switch, and the incoming three phases were intermitent. We were able to diagnose a third party problem from our desk and save vast amounts of site time. The installation has been handed over and inspected.

Suction Lift System

This residential block of flats in Cannock is protected by a FLOWST8n in suction lift. Thanks to Astbury Electrical, Pinchen Engineers and Staffordshire Survey Services for the photos.